Clayton Road Pavement Rehabilitation, PJ No.2609

Scope of Work: The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; earthwork and pavement and landscape grading; cold planning of asphalt pavement; placement of Hot Mix Asphalt (HMA) overlay, concrete curb, curb ramps, and sidewalk; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of roadside signs; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions.
Specifications (click to expand/collapse)
Name Size
PJ 2609 - Bid Specs-signed 11.3 MB