Public Jobs

Bids due in 9 days
12/15/22 2:00pm
Whitman Road Sanitary Sewer Improvements, Project No. 2513
Bids due in 9 days
City of Concord - Engineering Services
Concord, CA
The work to be done in general consists of mobilization, traffic control, storm water pollution control, clearing and grubbing, tree trimming, bypass pumping of sanitary sewer flows, open trench replacement of sanitary sewer mains, lateral reconnections, manhole rehabilitation, pavement rehabilitation, utility cover lowering and restoring to grade, survey monument reinstallation, ADA ramp construction, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings.
Bids due in 2 days
12/8/22 2:00pm
Clayton Road Traffic Operation Improvements - Phase 2 - Project No. 2579
Bids due in 2 days
City of Concord - Engineering Services
Concord, CA
The Work to be done consists of mobilization; traffic control and construction signage; installation of fiber optic communications cable in conduit, conduits, pull boxes, fiber optic splicing and testing, fiber optic switches, fiber optic small form pluggable modules, fiber pig tails, and other such items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Bidding Closed
11/17/22 2:30pm
Downtown Corridors Bicycle and Pedestrian Improvements No 2424
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The work to be done in general consists of mobilization, traffic control, erosion and sedimentation control, potholing of existing utilities, clearing and grubbing, tree trimming, tree removal, landscape and bioretention area installation, catch basin and storm drain pipe installation, sidewalk, driveway, curb and gutter, valley gutter, curb ramp installation, decorative concrete and performed thermoplastic crosswalk installation, signing, traffic striping and markings, flex-post delineators, lighting system, rectangular rapid flashing beacon, traffic signal modification, cold-in-place recycling, overlay and crack sealing, HMA base repairs, and all other work as specified in these Special Provisions and shown in the Drawings. The estimated base construction cost for the project is approximately $3.5 million. The Additive Bid 1 cost is approximately $65,000. The Additive Bid 2 cost is approximately $155,000. The Additive Bid 3 cost is approximately $77,000
Bidding Closed
10/27/22 2:00pm
Citywide Accessibility Improvements No. 9, Project 2602
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include traffic control, pedestrian detours, staging of the work, water pollution control program, clearing and grubbing, curb and gutter, sidewalk, valley gutter, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Bidding Closed
10/20/22 2:00pm
Citywide On-Call Sidewalk Replacement Phase 3, Project 2341
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The work to be performed under this Contract shall include the furnishing of all labor, materials, and equipment required to remove and reconstruct designated sections of sidewalk, driveways, curb ramps, and curb and gutter, including removal and replacement of associated asphalt and base or subgrade materials, and all other work as specified in these Special Provisions and as directed by the Project Manager in the field.
Bidding Closed
7/7/22 2:00pm
Library Roof Replacement Project No. 2569
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The work to be done in gerneral consists of the complete roof replacement of the existing Library Building Located on the Concord Civic Center campus in Concord, CA.
Bidding Closed
6/2/22 2:00pm
Traffic Safety Around Schools Project 2576
Bidding Closed
City of Concord - Engineering Services
City of Concord
The work to be done in general consists of mobilization, traffic control, curb ramp installation, signing, traffic striping and markings, rectangular rapid flashing beacon, traffic signal modification,and all other work as specified in these Special Provisions and shown in the Drawings.
Bidding Closed
5/26/22 2:00pm
Willow Pass Road Signal Upgrade Project, Project No. 2538
Bidding Closed
City of Concord - Engineering Services
City of Concord
The work to be done consists of, in general, the installation of fiber optic communications cable in conduit, pull boxes, fiber optic splicing, fiber optic tie in at the Civic Center including network equipment, modifications of traffic signals including cabinet installations, controller upgrades, Audible Pedestrian Signals (APS), countdown pedestrian heads, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Bidding Closed
5/19/22 2:00pm
Pothole and Base Repair 2 - Port Chicago Hwy and Bates Ave No 2556
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The scope of work is generally for pothole and base repair work along Port Chicago Highway and Bates Avenue in the City of Concord. Work shall include traffic control, staging of the work, water pollution control program, asphalt concrete removal, hot mix asphalt placement, pavement marking and striping removal and installation, detector loops and installation of city furnished video detection camera; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Bidding Closed
5/5/22 2:00pm
Hillcrest Park Regional Green Infrastructure Project, City Project No. 2512
Bidding Closed
City of Concord - Engineering Services
Concord, CA
The work to be done in general consists of mobilization, traffic control, dewatering, temporary water diversion, clearing and grubbing, tree removal and trimming, demolition and removal, storm water pump stations, wet well structures, diversion structures, junction chambers, storm water trash capture units, underground storm water detention system, bioretention basins, storm drain pipes, storm drain manholes, drainage inlets, curbs, curb and gutter, curb ramps, valley gutters, sidewalks, paving, signing, striping and markings, storm water pumps, controls and valves, planting, irrigation system , electrical system and lighting, and all other work asspecified in these Special Provisions and shown in the Drawings. The estimated construction cost for the project is approximately $2.85 million.