On-Call Citywide Sidewalk Replacement Phase 4

The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; concrete curb, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.

Status

Accepting Bids

Bid Date 10/23/25 2:00pm

Company & Contacts

City of Concord - Engineering Services
Tianjun Cao  

Location

Concord, CA

Reference

Engineer’s Estimate: $400,000.