Library Roof Replacement Project No. 2569
Status
Bidding Closed
Prebid Date | 6/23/22 10:00am |
Bid Date | 7/7/22 2:00pm |
Company & Contacts
Location
Concord, CA
The work will consist of: site mobilization (including temporary fencing), removal of the existing wood shingle and modified bitumen roofing systems, removal of flashings, downspouts, and trims, inspection of existing substrate once exposed, repair and if necessary replacement of portions of the existing substrate, installation of new underlayment substrate to receive new composition shingle and single ply roofing systems, installation of new flashings, gutters, downspouts, and trims, painting and sealing as noted on the drawings, and prep and re-painting of the concrete entrance canopy structure located at the main entrance of the library. This work includes all preparation, materials and accessories, clean up, conformance to existing conditions necessary for a complete and functional installed new roof systems, and all other work as specified in these Special Provisions, Technical Sections, and as shown on the Plans.
The estimated construction cost for the project is approximately $330,000.