Citywide Arterial and Collector Pothole and Base Repair Pavement Maintenance PJ 2567
The work to be done in general consists of: mobilization, traffic control, storm water pollution control program, remove and replace HMA, loop detector installation, adjust utility covers to finish grade; and such other items or details that are required by the Standard Specifications, the Special Provisions and as directed by the Engineer.
Specifications
(click to expand/collapse)

Name | Size | ||
2021 Pave Maint NTC - Copy | 140.0 KB | ||
PJ 2567 2021 Pave Maint SPs and attachements | 8.0 MB |