Diamond Boulevard - Willow Pass Road Sewer Repair No 2554
The work to be done in general consists of mobilization, traffic control, storm water pollution control, clearing and grubbing, tree trimming, bypass pumping of sanitary sewer flows, open trench replacement of sanitary sewer mains, lateral reconnections, manhole rehabilitation, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings. The estimated construction cost for the project is approximately $770,000.
Status
Bidding Closed
Bid Date | 8/26/21 2:00pm |
Company & Contacts
City of Concord - Engineering Services
Ali Hatefi
925-671-3284
Location
Concord, CA
Engineer’s Estimate – $750,000