Diamond Blvd Pavement Rehabilitation Project (PJ 2727)

Scope of Work: The work to be done in general consists of mobilization; preparatory work; securing the work area for public safety; daily site cleanup; traffic control; water pollution control program; clearing, grubbing, trimming and root pruning; removing and replacing concrete sidewalk, curb, and gutter; constructing curb ramps; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping and curb paint; removal and replacement of roadside signs; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.