Galindo Street / Monument Blvd. Pavement Rehabilitation Project, PJ 2452
Scope of Work: The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, traffic control; water pollution control program; monuments preservation; cold planning of asphalt pavement; profile grind; placement of Hot Mix Asphalt (HMA) overlay; Digout repairs; concrete curb and sidewalk replacement; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; removing traffic loop detections; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.
Plans
(click to expand/collapse)

Name | Size | ||
Galindo Pavement Rehab - Plan - signed | 37.1 MB |