Residential Pavement Maintenance No. 1, PJ 2741

Scope of Work: The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, traffic control; water pollution control program; localized excavation and subgrade preparation for pavement repairs and digouts; cold planing of asphalt pavement; placement of Hot Mix Asphalt (HMA); residential street slurry seal; concrete curb, curb ramps, and sidewalk; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; and all other work shown on the Plans and as specified in the Project Manual and all other work as specified in these Special Conditions, Technical Provisions, and as shown on the Plans.