2023 Citywide Asphalt Patch Repair Project, PJ 2593-2
The work to be done in general consists of mobilization; traffic control plan development; water pollution control program; cold planing; placement of hot mix asphalt materials; pruning and removing tree roots; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping and pavement markings; installation of shoulder backing; removal and replacement of loop detectors; and all other work shown on the Plans and as specified in these Special Provisions.