Downtown Corridors Bicycle and Pedestrian Improvements No 2424

The work to be done in general consists of mobilization, traffic control, erosion and sedimentation control, potholing of existing utilities, clearing and grubbing, tree trimming, tree removal, landscape and bioretention area installation, catch basin and storm drain pipe installation, sidewalk, driveway, curb and gutter, valley gutter, curb ramp installation, decorative concrete and performed thermoplastic crosswalk installation, signing, traffic striping and markings, flex-post delineators, lighting system, rectangular rapid flashing beacon, traffic signal modification, cold-in-place recycling, overlay and crack sealing, HMA base repairs, and all other work as specified in these Special Provisions and shown in the Drawings. The estimated base construction cost for the project is approximately $3.5 million. The Additive Bid 1 cost is approximately $65,000. The Additive Bid 2 cost is approximately $155,000. The Additive Bid 3 cost is approximately $77,000
Plans (click to expand/collapse)
Name Size
PJ2424 Final Plans 23.5 MB