Residential Pavement Maintenance, Phase B: Northwood Drive - Zone 5C PJ No. 2608
The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing, trimming and root pruning; tree removal; constructing and removing and replacing concrete sidewalk, curb, gutter, valley gutter and curb ramps; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; lowering and adjusting utility covers to finish grade; removal of traffic striping and removal and replacement of curb paint; and all other work shown on the Plans and as specified in these Special Provisions.