Willow Pass and Landana Sewer Capacity Improvements, PJ No. 2702-2704

The scope of work generally consists of mobilization, traffic control, storm water pollution control, bypass pumping of sanitary sewer flows, open trench replacement of sanitary sewer mains, Pipe bursting of sanitary sewer mains, Cured In Place Pipe, sanitary sewer lateral disconnection and reconnection, manhole rehabilitation, concrete curb and gutter, concrete flatwork, pavement rehabilitation, utility cover adjustment to grade, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings.
Plans (click to expand/collapse)
Name Size
PJ2702-2704 Final Plans 39.2 MB