Monument Boulevard Pavement Rehabilitation Project, PJ No. 2581

General Description: The work to be done in general consists of mobilization, traffic control, storm water pollution control, clearing and grubbing, tree trimming, asphalt concrete grinding/removal, asphalt concrete installation, rubberized AC installation, asphalt dig out repairs, utility cover lowering and restoring to grade, survey monument adjustments, concrete curb ramp and sidewalk improvements at select locations, pedestrian pushbutton relocations, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings. The City may also accept add alternative work items listed in the bid schedule, which includes improvements at 1650 Monument Boulevard, including sidewalk realignment, storm drain pipe and manhole installation, and private property relocations as shown in the Drawings.
Specifications (click to expand/collapse)