East Downtown Concord PDA Access & SR2T Project, PJ No. 2457

The scope of work is generally for construction of new sidewalk, curb ramps and driveways to enhance pedestrian connectivity to and from the Downtown Concord PDA that provides access to the BART station, Priority Development Area (PDA), bus stops, schools and parks. The work shall include traffic control, staging of the work, erosion and sediment controls, storm water pollution control, clearing and grubbing, demolition and off-haul of existing improvements, curb and gutter, sidewalk, driveways, asphalt pavement, concrete walkways and driveway conform, asphalt concrete sawcut and removal, traffic signal modification, pavement striping and marking removal and installation, replacement of existing improvements, and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Addendum 1 (click to expand/collapse)