Clayton Valley Highlands Sanitary Sewer Repairs PJ, 2729
Scope of Work: The work to be done in general consists of mobilization; preparatory work, securing the work area for public safety, and site cleanup daily, clearing and grubbing, traffic control; water pollution control program; potholing of existing utilities; bypass pumping of sanitary sewer flows; open trench replacement of sanitary sewer mains and laterals, pipe bursting of sanitary sewer mains and laterals; CIPP lining of existing sewer lines; sewer cleanout installations; manhole rehabilitation; lowering and adjustment of utility covers to finish grade; grind and overlay; removal & replacement of traffic striping and pavement markings; and all other work shown on the Plans and as specified in the Project Manual, Special Conditions, and Technical Provisions.
| Filetype Icon | Name | Size |
|---|---|---|
| 16.7 MB |
