Traffic Safety Around Schools Project 2576
The work to be done in general consists of mobilization, traffic control, curb ramp installation, signing, traffic striping and markings, rectangular rapid flashing beacon, traffic signal modification,and all other work as specified in these Special Provisions and shown in the Drawings.
Plans
(click to expand/collapse)

Name | Size | ||
PJ2576 Final Plans | 4.1 MB |