Grant Street -East Street Pavement Rehab Project No 2525
The work to be done in general consists of mobilization, traffic control, water pollution control, demolition, tree removal, potholing of existing utilities, open trench of storm drain, street asphalt concrete pavement by full depth reclamation method, asphalt concrete grind and overlay, concrete curb and gutter, concrete sidewalk, concrete driveway, concrete median, concrete ADA ramp construction, utility adjustments, traffic striping, pavement markings and markers, street lighting, traffic signal modification, landscape and irrigation construction, and all other work as shown on the Plans and as specified in these Special Provisions.
Status
Bidding Closed
Bid Date | 4/7/22 2:30pm |
Company & Contacts
City of Concord - Engineering Services
Aldrich Bautista
925-671-3028
Location
Concord, CA
The estimated construction cost for the Total Bid ranges from $4,000,000 to $4,500,000.