Pavement Maintenance – Zone 3 Project No 2443
The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway section; crack sealing; placement of Hot Mix Asphalt (HMA) leveling course and Thin Maintenance Overlays (TMO); removal & replacement HMA; removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; pruning and removal of tree roots; lowering and adjustment of utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of roadside signs and pedestrian barricades; and all other work shown on the Plans and as specified in these Special Provisions.
Addendum 1
(click to expand/collapse)

Name | Size | |||
2021-11-24_2443 Addendum 1 | 250.0 KB |
Addendum 2
(click to expand/collapse)

Name | Size | |||
2021-12-15_2443 Addendum 2 | 3.4 MB |
Addendum 3
(click to expand/collapse)

Name | Size | |||
2022-01-07_2443 Addendum 3 | 151.5 KB |