Citywide Accessibility Improvements No 8 Project 2519

The scope of work is generally for constructing curb ramps at various locations throughout the City of Concord. Work shall include traffic control, pedestrian detours, staging of the work, water pollution control program, clearing and grubbing, curb and gutter, sidewalk, valley gutter, asphalt concrete removal, hot mix asphalt, pavement marking removal and installation; and such other items or details that are required by the Plans, Standard Specifications, the Special Provisions and as directed by the Engineer.
Specifications (click to expand/collapse)
Name Size
2519 Final Specs 7.0 MB