Pavement Maintenance – Zone 4 No 2444

The work to be done in general consists of mobilization; traffic control; water pollution control program; cold planning of asphalt roadway section; crack sealing; placement of rubberized hot mix asphalt (RHMA); removal & replacement of hot mix asphalt (HMA); removal & replacement of concrete sidewalk, curb & gutter, curb ramps, driveways and valley gutters; construction of island passageways; pruning and removal of trees and tree roots; lowering and adjustment of utility covers to finish grade; removing and replacing speed humps; removal & replacement of traffic striping and pavement markings; removal and replacement of roadside signs. The estimated construction cost for the project is approximately $2.57 million.
Addendum 1 (click to expand/collapse)
Name Size
2020-12-15_2444 Addendum 1 234.9 KB
Addendum 2 (click to expand/collapse)
Name Size
2020-12-22_2444 Addendum 2 478.9 KB
Addendum 3 (click to expand/collapse)
Name Size
2021-01-15_2444 Addendum No 3 480.1 KB