Commerce Avenue Complete Streets Project No 2085
The work to be done in general consists of cold planing, full depth reclamation, adjusting utility covers, hot mix asphalt (Type A), drainage inlet filters, fiber optic conduit and box installation, reconstruction of curb ramps, sidewalks and driveways for ADA compliance, roadside signs, adjustments to pedestrian push buttons, LED Street lights, Class III bike route striping, traffic control, staging of the work, implement, maintain and reporting per the storm water pollution prevention plan, and other work as shown on the Plans and as specified in these Special Provisions.
Status
Bidding Closed
Bid Date4/23/20 3:00pm
Company & Contacts
city of concord
Aldrich R. Bautista, P.E.
(925) 671-3028
Location
Concord, CA
The DBE contract goal for this project is 16.0%.
The estimated construction cost for the Total Bid is $1,900,000.