Treat Boulevard Pavement Rehabilitation (Phase 2) PJ, 2559

The work to be completed by the awarded contractor in general consists of mobilization, traffic control, water pollution control, demolition, bird nesting survey, tree removal, potholing of existing utilities, street pavement rehabilitation by cold in-place recycling method, asphalt concrete grind and overlay, placing and compacting hot mixed asphalt and rubberized hot mixed asphalts, remove and replace concrete curb and gutter, remove and replace concrete sidewalk, upgrade concrete ADA ramp construction, utility cover adjustments, traffic striping, pavement markings and markers, landscaping, irrigation, and all other work as shown on the Plans and as specified in these Special Provisions.

Status

Accepting Bids

Bid Date5/2/24 2:00pm

Company & Contacts

City of Concord - Engineering Services
Kevin Wheat  

Location

Concord, CA

The estimated construction cost for the Total Bid is $5,800,000.