Residential Pavement Maintenance, Phase B: Paving - Zones 4O, 5C & 5D Project, PJ No. 2607-2608

The work to be done in general consists of mobilization; traffic control; water pollution control program; clearing, grubbing and root pruning; cold planning of asphalt roadway; placement of Hot Mix Asphalt (HMA) materials; crack sealing; lowering and adjusting utility covers to finish grade; removal and replacement of traffic striping; removal and replacement of roadside signs; and all other work shown on the Plans and as specified in these Special Provisions.
Plans (click to expand/collapse)
Name Size
2607-2608_Paving_Final Plans 13.9 MB