Monument Boulevard Signal Upgrade Project, PJ 2578
The work to be done consists of, in general, the installation of fiber optic communications cable in conduit, pull boxes, fiber optic splicing, along Monument Boulevard, modifications of traffic signals including reflective traffic signal borders and battery backup system upgrades, and such other items or details that are required by the Plans, Standard Specifications, or these Special Provisions to be performed, placed, constructed, or installed.
Status
Bidding Closed
Bid Date7/27/23 3:00pm
Company & Contacts
City of Concord - Engineering Services
Deyuanne Lei Deyuanne.Lei@CityofConcord.org
Location
Concord, CA
The estimated construction cost for this project is between $2,250,000 and $2,750,000 for the base bid, without contingency.