The work to be done in general consists of mobilization, traffic control, water pollution control program, potholing, rubberized hot mix asphalt (HMA), hot mix asphalt (HMA), cold planing, pulverization and grading, quicklime/cement soil treatment, removal and replacement of concrete curb and gutter, sidewalk, valley gutter and curb ramps, pruning and removal of tree roots, root barrier installation, lowering and adjustment utility covers to finish grade, removal and replacement of striping and pavement markings, removal of traffic loop detectors and installation of video detection system and all other work shown on the plans and as specified in the special provisions.