Citywide Arterial and Collector Pothole and Base Repair Pavement Maintenance PJ 2567

The work to be done in general consists of: mobilization, traffic control, storm water pollution control program, remove and replace HMA, loop detector installation, adjust utility covers to finish grade; and such other items or details that are required by the Standard Specifications, the Special Provisions and as directed by the Engineer.
Addendum 1 (click to expand/collapse)
Name Size
PJ 2567 Addendum No.1 318.1 KB
Addendum 2 (click to expand/collapse)
Name Size
2567 Addendum 2 1.0 MB