Diamond Boulevard - Willow Pass Road Sewer Repair No 2554

The work to be done in general consists of mobilization, traffic control, storm water pollution control, clearing and grubbing, tree trimming, bypass pumping of sanitary sewer flows, open trench replacement of sanitary sewer mains, lateral reconnections, manhole rehabilitation, traffic striping and markings, and all other work as specified in these Special Provisions and shown in the Drawings. The estimated construction cost for the project is approximately $770,000.
Addendum 1 (click to expand/collapse)
Name Size
2021-07-22_2554 Addendum 1 166.9 KB
Addendum 2 (click to expand/collapse)
Name Size
2021-08-17_2554 Addendum 2 61.6 KB