Concord Community Park Irrigation Supply Line Project 2242

The work to be done in general consists of mobilization, traffic control, storm water pollution control, potholing of existing utilities, removal and disposal of asbestos cement pipe, open trench construction of PVC irrigation supply line, landscape restoration, aggregate base, hot mix asphalt placement, sidewalk, curb and gutter reconstruction, traffic striping, and all other work as specified in the Special Provisions and shown in the Drawings. The estimated total construction cost for the project is approximately $500,000 (base bid + additive bid).